Archive | Theatre

Hammersmith Apollo

Sector: Theatre Main Contractor: GF Holdings Architect: Foster Wilson Architects Services: • Inspection and Securing of Historic Plasterwork • Repair and Restoration of Historic Plasterwork The Grade II* listed building, designed by architect Robert Cromie and noted for its glorious Art Deco interiors opened in 1932 as the Gaumont Palace Cinema. Since then there have […]

Continue Reading 0

Plaza Super Cinema, Stockport

Sector: Theatre Main Contractor: G F Holdings Architect: Brock Carmichael Architects Services • Mortar Analysis • Lime plastering • Repair & restoration of ornate plaster mouldings Stockport Plaza is a rare surviving Art Deco Super Cinema, generally acknowledged from an architectural perspective to be the most sophisticated building in Stockport. Commissioned by the Reid, Snape […]

Continue Reading 0

St George’s Hall

Sector: Theatre Main Contractor: Holden Conservation Architect: Bradford City Council Services • Restoration and reproduction of ornate plaster mouldings • Lime plaster repairs to ceiling St George’s Hall is a Grade II* listed Victorian building located in the centre of Bradford. The concept of the Hall was proposed in 1849. As Bradford grew in size […]

Continue Reading 0