Leyland House

Sector: Residential Services • Supply and installation of Ornate Interiors Standard Mouldings Leyland House is a 7,000 sq ft new-build property, complete with swimming pool and private cinema. The owners visited Ornate Interiors’ showroom looking for design ideas. Through consultation with the clients Ornate Interiors were able to determine their needs and working one room […]

Continue Reading 0

Haymarket Hub

Sector: Rail Main Contractor: Tolent Construction Architect: Reid Jubb Brown Partnership Services • Steel suspension system • Insulation • Knauf MP75 Spray Plastering The Haymarket Hub is a £22 million metro station development in the heart of Newcastle-upon-Tyne, marked by a distinctive zinc-covered roof. Ornate Interiors were appointed to carry out internal plasterwork on the […]

Continue Reading 0

Apex Hotel, Edinburgh

Sector: Hotels Main Contractor: Bovis Architect: Ian Springford Architects Services • Lath and lime plaster • Restoration of ornate mouldings • Reproduction of ornate mouldings • External render The Apex Hotel is a listed Georgian property in the centre of Edinburgh. Ornate Interiors carried out repairs to the traditional lime plasterwork, mostly onto riven laths, […]

Continue Reading 0

Leeson Park

Sector: Residential Main Contractor: Merrion Contracting Architect: Coady Partnership Services • Restoration and replication of ornate plaster mouldings Leeson Park is among the smartest residential areas in Dublin. This particular property had been converted to a dozen bedsits, a change that destroyed its former Victorian grandeur. Much of the fine plasterwork that was such a […]

Continue Reading 0

Huddersfield Town Hall

Sector: Public Main Contractor: Strategic Team Group Architect: Aedas Services • Site Survey • Lime Plastering • Restoration of historic plaster mouldings Having commissioned in-depth Advisory Reports from Ornate Interiors for town halls in Batley, Dewsbury and Cleckheaton, Kirklees Council invited the company to help the chosen main contractors Strategic Team Group with the restoration […]

Continue Reading 0

Gorton Monastery

Sector: Ecclesiastical Main Contractor: William Anelay Limited Architect: Austin Smith Lord Services • Lath & Lime plastering • Reproduction of plaster mouldings Gorton Monastery was founded on a four-acre site in East Manchester, acquired in the 1860s by Franciscan monks for £2,200. Built between 1863 and 1867, the friary was designed by Edward Welby Pugin, […]

Continue Reading 0

St Marys Church, Honley

Sector: Ecclesiastical Main Contractor: Anderson Marriott Decorators Architect: NPS Group Services • Lime Plastering • Fibrous Plaster Mouldings St Mary’s church at Honley, near Huddersfield, was constructed in 1873 on the site of an earlier church known as ‘Old Peg’ which dated back to 1759. Wakefield-based property consultants NPS, who masterminded this conservation project, called […]

Continue Reading 0

Majestic Hotel, Harrogate

Sector: Hotels Main Contractor: Ramparts Interior Contracts Architect: Mi Design Services • Restoration of historic plaster mouldings • Manufacture and installation of Ornate Interiors’ standard mouldings   Ornate Interiors were on site at The Majestic Hotel for twelve months, carrying out the restoration of the historic ornate plasterwork.historic ornate plasterwork. Much of the work took […]

Continue Reading 0

Stable Block, Nostell Priory

Sector: Buildings of Historical Interest Main Contractor: William Birch Architect: Rodney Melville & Partners Services • Mortar Analysis • Lime plastering • Reproduction of ornate plaster mouldings • External stucco rendering The house was built in 1733 on the site of a 12th-century priory, by James Paine for Sir Rowland Winn. The Stable Block was […]

Continue Reading 0